Welcome to the Military College of Engineering Iqbal Library
Image from Google Jackets

Evaluation of risk factors causing cost & time overrun in road projects of Fata, Pakistan (CEM) Irfan Zafar

By: Contributor(s): Material type: TextTextPublication details: 2014Description: 129 PSubject(s): DDC classification:
  • T--162 T-162
Online resources:
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Share
Copyright © 2014 NUST Military College of Engineering , Library. All rights reserved.