Welcome to the Military College of Engineering Iqbal Library
Image from Google Jackets

Formulation of a strategy based on the identified critical causes of schedule over run in mega construction

By: Material type: TextTextPublication details: Risalpur, MCE, 2020.Description: xiii,58pSubject(s): DDC classification:
  • T-261
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Status Barcode
Books Books NUST/MCE Iqbal Library T-261 (Browse shelf(Opens below)) Available T-261

There are no comments on this title.

to post a comment.
Share
Copyright © 2014 NUST Military College of Engineering , Library. All rights reserved.