000 00501nam a22001697a 4500
999 _c15070
_d15070
082 _aP-838
100 _aMuhammad Anwar Ul Haq Shah
245 _aBIM Based Approach Towards Minimization of Floor Tile's Wastage
260 _aRisalpur,
_bMCE,
_c2020.
300 _axi,60 pages.;
_c30cm.
500 _aSyn-01
650 _aConstruction Engineering & Management
700 _aSupervisor Dr Rai Waqas Azfar Khan
700 _a Wasiq Ahmad
700 _aNoor Ud Din Muhammad Tehmoor
942 _cBK